✺ Vevey Arena 2022 Arena activity Santa Claus visits – hosted by the black King and Queen. — 06/01/202203/09/2022 2021 arena deconstruction (5) In preparation . . . [page] — 09/09/202109/09/2021 2021 Green arena (15) Outfitting the arena, short film — 27/08/202123/11/2021 2021 Black screen & mask Video over background — [page] — 25/08/202130/08/2021 2021 Multi-layer video masking Using Adobe Premiere [page] — 17/08/202127/08/2021 2021 Outfitting (14) the ramp Beyond the launch – the outfitting. 12/08/202109/09/2021 2021 Revamp the ramp (10) Rise & fall (10) — major ramp updates 11/08/202116/02/2023 2021 120 steps (11) Placing of 120 steps onto the bare raising stairway: 09/08/202111/08/2021 2021 Construct & integrate (9) Rise & fall (9) — model completion. 11/04/202111/08/2021 2020 Stairway development (8) Excitement as model stairway integration begins: 21/11/202011/08/2021 2020 Beneath the surface (7) ‘Beneath & through’, or ‘below and beyond’, 14/03/202011/08/2021 2020 Cool perspectives (13) Cool jazz and cool perspectives. 10/03/202009/09/2021 2020 Arena ramp integration (3) Ramp model integrates with our documentary: 02/03/202011/08/2021 2020 260 piles (6) 260 piles must be removed . . . 11/02/202009/09/2021 2020 Sound mast removal (4) Sound mast: removing one of them: 16/01/202011/08/2021 2020 Arena visit – tech (2) Arena visit — key elements of the arena technology: 11/11/201911/08/2021 2020 Vevey ambience (1) Ambience in and around the Vevey arena: 25/10/201911/08/2021 2018 Project progress & timelines Join in the development of a documentary in motion . . [page] — 21/08/201905/11/2022 2019 ORA ET LABORA Film: 8 years of preparation. — 03/08/201903/08/2022
2018 Project progress & timelines Join in the development of a documentary in motion . . [page] — 21/08/201905/11/2022